Environmental Impact Assessment

An environmental impact assessment is required before a project can obtain its construction permit. We prepare assessments under Class A accreditation, the highest class for environmental studies, covering project classification into category 1, 2 or 3 through to an environmental management plan that can be implemented and reviewed.

Class AThe highest accreditation class for environmental studies
3 categoriesProjects classified 1, 2 or 3 by impact level
NCECStudies within the environmental-compliance framework
Baseline air-quality monitoring station on undisturbed scrubland, with an industrial development on the horizon

Environmental impact assessment stages

01

Screening and classification

Establishing the project's environmental category — 1, 2 or 3 — by the level of its impact and the nature of its activity.

02

Baseline studies

Characterising the site's environmental condition before the project: air, water, soil, noise and biodiversity.

03

Impact prediction and evaluation

Analysing the expected effects on each environmental medium through construction and operation.

04

Mitigation measures

Setting the measures that reduce impacts to levels acceptable under the regulations, and assigning responsibility for each.

05

Environmental management plan

An operational plan of measures, monitoring and responsibilities across the project life cycle.

06

Dossier preparation and submission

Producing the study in the required form and following it through to the construction permit.

Applicable sectors

Industrial projects

Factories, crushers and processing facilities.

Mining projects

Mines, extraction sites and processing plants.

Infrastructure

Transport, roads and major utility projects.

Water plants

Desalination and wastewater-treatment plants.

Request an environmental impact assessment

Contact us with details of the activity, the site and the project's current stage.